Nido de Abeja en Hormigón
- Date: March, 2020
- Place: Provincia de Misiones
- Producer: Diseño y Construcciones SA + Vibrocoma
Tasks performed
Repair. When stripping the formwork, the presence of honeycombs was observed as a result of poor compaction of the concrete. To repair it, the affected area was cleaned and filled with a very fluid cementitious grout to guarantee its correct filling. Additionally, to ensure good adhesion, a new-old concrete epoxy adhesion bridge was used.